Possible to run multiple demoes in parallel -bug or feature?
Before on the DK1, when running multiple demoes, the tracker would only work with the first one launched.
Now with DK2 (SDK 0.4.2, FW 2,12) it's possible to run multiple demoes at once, and the tracking information is forwarded to all of them.
Since this wasn't possible on the DK1, is this an accident and will be patched off?
Or is it safe to develop a stand-alone tracking-only applications (mostly for experimenting with input controls) on the side?
Now with DK2 (SDK 0.4.2, FW 2,12) it's possible to run multiple demoes at once, and the tracking information is forwarded to all of them.
Since this wasn't possible on the DK1, is this an accident and will be patched off?
Or is it safe to develop a stand-alone tracking-only applications (mostly for experimenting with input controls) on the side?
